Trailer Status Update

So a lot has gotten done on the trailer since October and it has been on its first trip as well.

First we got up the finished paneling and stained it.

IMG_1088

We installed the floor.

IMG_1095

We installed a roof vent with a powered fan to keep the interior ventilated.  It was a bit nerve-wracking to cut a large hole in the ceiling but it turned out ok in the end.

IMG_1087   IMG_1092

The frame for the murphy bed is installed, but sill needs to have the finish paneling and table installed on the bottom side of the frame.

IMG_1098

And last but not least we got the heater installed.  Another terror inducing, huge hole through all layers of the wall; but it works great.

IMG_1099   IMG_1106

Next on the list are the kitchen amenities!

Upcoming post about the Christmas trip to the Hoh Rainforest and Kalaloch Beach, maiden voyage of the Adventure Trailer.

Comments Off on Trailer Status Update

Filed under Projects

Comments are closed.